Diamond Concrete Products Case Study
A Solution for the Manufacturing Industry Download the Case StudyThe Result
After switching to Diamond’s Standard Series chain, the manufacturer experienced an increase in uptime that exceeded the projected 50% estimate – significantly decreasing downtime and labor costs. This saved the company over $6,500 in the first year and an estimated $33,000 after five years.