Diamond Pulp and Paper Case Study
Maximizing Uptime: Diamond® Chain Improves Efficiency In The Pulp And Paper Industry Download the Case Study
The Result
Implementing Diamond chain delivered two benefits: an extended life cycle and substantial cost savings.
The chain lasted an impressive 70 weeks – nearly triple the lifespan of the previous chain and double its projected 36-week lifespan. While the chain’s cost remained minimal, when combined with the reduction in downtime, the savings were an estimated $88,000 annually. This success demonstrates Diamond Drives’ ability to provide tailored solutions that promote operational excellence while delivering measurable financial benefits.