Drives® Ez Breaker® Tool Reduces Downtime, Waste & Risk Case Study
A Solution for the Forestry & Paper Industry Download the Case Study
The Result
The EZ Breaker tool helped reduce the need for dangerous tools and improved workplace safety. The shift to bulk reels led to a 20% reduction in chain waste, and a savings of $12,000 on their current annual spend on small pitch chain. Additionally, a minimum of $132,000 of downtime was avoided based on $2,200 per minute for 60 minutes (or six assemblies). Overall, the documented value of the solution totaled $144,000 and the company now benefits from safer, cleaner, and more cost-effective chain maintenance practices.

