High Speed Operation Chain Failure Case Study
High Speed Operation Chain Failure – Lumber Mill Case Study Download the Case Study
The Result
After switching to Diamond®️ Standard Series chain, the lumber mill experienced savings of $50,897 in reduced downtime and $1,497 in reduced chain expenditures for the year.